Structures for Hebron mining field
Energomontaż-Północ Gdynia is carrying out commissioning the structure of four pile anchors which are designed for Hebron mining field in Newfoundland.
EPG will perform four structures with a diameter of 1.7 m and a length of 16 m, which will be used to anchor to the seabed construction of two turrets that have also been made in the EPG. Recently the similar structures EPG made for Greater Stella mining field.